Arthington Viaduct, also known as Castley Viaduct and listed as the Wharfedale Viaduct, carries the Harrogate Line across the Wharfe valley between Arthington in West Yorkshire and Castley in North Yorkshire, England. It is a Grade II listed structure.[1]

The viaduct was built, between 1845 and 1849, in a curve some 500 yards (460 m) in length, with 21 semi-circular arches on high piers. Construction was supervised by Chief Engineer of the Leeds and Thirsk Railway Thomas Grainger, who built the line from Leeds to Stockton-on-Tees via Harrogate and Thirsk. The foundation stone was laid on 31 March 1846 by Henry Cooper Marshall, Chairman of Leeds and Thirsk Railway Company and the line opened on 10 July 1849 when the nearby Bramhope Tunnel, another key component of the line, was complete. In excess of 50,000 tons of stone were used in its construction.

Dimensions

References

  1. Historic England. "WHARFEDALE VIADUCT (1253368)". National Heritage List for England. Retrieved 12 January 2016.
  2. "Wharfedale (Arthington) Viaduct". National Railway Museum. Retrieved 12 January 2016.
Wikimedia Commons has media related to Arthington Viaduct.

Coordinates: 53°54′21″N 1°36′02″W / 53.90576°N 1.60050°W / 53.90576; -1.60050

This article is issued from Wikipedia - version of the 10/4/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.