Barnard River Scheme

The Barnard River Scheme is an inter-basin water transfer system in New South Wales, which can transfer water from the Barnard River in the upper Manning River catchment over the Mount Royal Range into the Hunter River.

The scheme was constructed between 1983 and 1985, to provide drought relief water for Bayswater Power Station which was being constructed at the same time.

The scheme consists of:

References

    External links

    This article is issued from Wikipedia - version of the 11/14/2012. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.