Beerburrum railway station

Beerburrum

Northbound view from Platform 2 in September 2012
Location Church Street, Beerburrum
Coordinates 26°57′37″S 152°57′30″E / 26.9602°S 152.9583°E / -26.9602; 152.9583Coordinates: 26°57′37″S 152°57′30″E / 26.9602°S 152.9583°E / -26.9602; 152.9583
Owned by Queensland Rail
Operated by City network
Line(s) North Coast
Distance 64.76 kilometres from Central
Platforms 2 side
Tracks 2
Construction
Structure type Ground
Parking 30
Disabled access Yes
Other information
Status Unstaffed
Station code 600481 (platform 1)
600482 (platform 2)
Fare zone go card 10
Website Queensland Rail
History
Rebuilt 14 April 2009
Electrified Yes
Services
Preceding station   Queensland Rail   Following station
toward Roma Street
Sunshine Coast Line

Beerburrum railway station is located on the North Coast line in Queensland, Australia. It serves the town of Beerburrum in the Sunshine Coast Region.

History

Looking towards the railway station, Beerburrum, 1916

Beerburrum station was originally a single platform with a crossing loop. As part of the construction of a new 14 kilometre alignment for the North Coast line from Caboolture to Beerburrum, a new station was built immediately to the east, opening on 14 April 2009. Beyond Beerburrum, the line becomes single track.[1][2] It is scheduled to be duplicated to Landsborough by 2021.[3]

Services

Beerburrum is serviced by City network services to Brisbane, Nambour and Gympie North.[4] To relieve congestion on the single track North Coast line north of Beerburrum, the rail service is supplemented by a bus service operated by Kangaroo Bus Lines on weekdays between Caboolture and Nambour as route 649.[5]

Services by platform

Platform Lines Destinations Notes
1 Sunshine Coast Caboolture & Brisbane Roma Street [6]
Springfield Central & Ipswich Peak hours only[6]
2 Sunshine Coast Nambour & Gympie North [7]

References

  1. Landsborough station upgrade plans revealed Queensland Government 21 December 2006
  2. Caboolture to Beerburrum Duplication Queensland Rail
  3. Caboolture to Landsborough Rail Upgrade Study Department of Transport & Main Roads
  4. Sunshine Coast line timetable TransLink 20 January 2014
  5. Route 649 timetable TransLink 20 January 2014
  6. 1 2 Beerburrum Platform 1 TransLink
  7. Beerburrum Platform 2 TransLink

External links

This article is issued from Wikipedia - version of the 10/29/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.