Pioneer Village (TTC)
Location |
Steeles Avenue West, Vaughan & Toronto, Ontario Canada | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Coordinates | 43°46′39″N 79°30′41″W / 43.77750°N 79.51139°WCoordinates: 43°46′39″N 79°30′41″W / 43.77750°N 79.51139°W | ||||||||||
Platforms | Centre platform | ||||||||||
Tracks | 2 | ||||||||||
Bus operators | TTC | ||||||||||
Connections | Pioneer Village Terminal (York Region Transit) | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Disabled access | Yes | ||||||||||
Architect | Spadina Group Associates | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
History | |||||||||||
Opening | Proposed for 2018[1] | ||||||||||
Services | |||||||||||
|
Pioneer Village is a subway station under construction on the Yonge–University–Spadina line in Toronto, Ontario, Canada, and in Vaughan, Ontario, Canada, on its western branch, the Spadina line. It was originally planned to be a temporary terminus, with the line later extended further to Vaughan Metropolitan Centre; however, the entire extension is now set to open simultaneously. The station will be located on Steeles Avenue West at Northwest Gate.
Most TTC contracted routes in Vaughan will now be in YRT operation, and will operate out of this station, no longer operating south of steeles.
Name
The station was originally expected to be named Steeles West, but was renamed to Black Creek Pioneer Village on September 28, 2012 for Black Creek Pioneer Village.[2] On July 24, 2013, the unbuilt station was renamed once more, shortening it to Pioneer Village.[3]
Description
The major buildings of York University's main Keele Campus lie to the southeast of the proposed location. Black Creek Pioneer Village, Canlan Ice Sports and Aviva Centre are found to the southwest, and the Toronto Track and Field Centre to the east.
The station will be built underground, lying on a northwest-southeast axis. The line will approach from York University station northwestward, directly under the university's main buildings, to meet the station. Construction may require the removal of the parking lot at Northwest Gate and use of vacant land next to the United Parcel Service centre in Vaughan.
The proposal includes separate TTC, YRT/VIVA and GO Transit bus terminals, with a passenger pick-up/drop-off alongside major commuter parking lots built on vacant lands north of Steeles.
Much of the station itself would exist north of Steeles, in the city of Vaughan in York Region. This would be the first time a TTC subway facility will extend beyond the current City of Toronto.
The Spadina Group Associates has been commissioned for the station's design, which features entrances on the southeast and northwest sides; their layout will mirror each other, giving the overall design a symmetrical effect. The southeast entrance (in Toronto) is to have a TTC bus terminal attached, while the northwest entrance (in Vaughan) features a YRT terminal. The southwest corner of the intersection would also include an oculus for a light cone above the platform. The station would have three levels overall: the entrances at street level, separate concourses just below them, and the platform at bottom. Enough space is planned between Steeles Avenue and the subway tunnel to allow an underground station for a future Light Rail Transit line. A large commuter lot will be situated in the hydro corridor to the north.[4]
On November 27, 2009 the official ground breaking ceremony was held for the Spadina Extension, and tunnelling began in June 2011. The project was expected to be completed by the autumn of 2016,[5] but it is now estimated that 31 December 2017 would be the earliest achievable date to deliver the project.[1]
Surface connections
The following routes will serve this station. [6]
- 35A/C Jane southbound to Jane Station
- 41A/B/E Keele eastbound to Finch West and southbound to Keele Station
- 60/E Steeles West eastbound to Finch and westbound to Martin Grove/Highway 27.
- 84D Sheppard West eastbound to Sheppard-Yonge Station via Downsview Station
- 106 Sentinel southbound to Downsview Station
- 107 Keele North southbound to Downsview Station
- 108A/B Downsview southbound to Downsview Station
- 195 Jane Rocket southbound to Jane Station
References
- 1 2 A. Byford, CEO (26 March 2015). "Toronto-York Spadina Subway Extension – Schedule and Budget Change" (PDF). Toronto Transit Commission. Retrieved 15 May 2015.
The TYSSE project is currently 70 per cent complete. However, it has been determined that the publicly stated opening date of the end of 2016 and the approved budget are not achievable. This report recommends that a comprehensive project “reset” involving a new third-party project manager be undertaken to deliver the project by December 31st, 2017
- ↑ Kalinowski, Tess (28 September 2012). "TTC names new subway station for Black Creek Pioneer Village". Toronto Star. Retrieved 2012-09-28.
- ↑ TTC renames new subway stop Pioneer Village station, Toronto Sun, July 24, 2013
- ↑ http://www3.ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2009/October_29_2009/Reports/TYSSE_Steeles_West_S.pdf
- ↑ "Schedule Status Update" (PDF). Toronto-York Spadina Subway Extension Project. Toronto Transit Commission. 24 October 2012. Retrieved 29 October 2012.
- ↑ http://ttc.ca/TTC_Surveys/Subway_Access_Adjust.jsp