Coryton Power Station
Coryton Power Station | |
---|---|
Coryton Power Station | |
Location of Coryton Power Station in Essex | |
Country | England, United Kingdom |
Location | East of England, Essex |
Coordinates | 51°30′43″N 0°30′29″E / 51.512000°N 0.508000°ECoordinates: 51°30′43″N 0°30′29″E / 51.512000°N 0.508000°E |
Commission date | 2002 |
Owner(s) | Intergen |
Operator(s) | Coryton Energy Ltd |
Thermal power station | |
Primary fuel | natural gas |
Combined cycle? | yes |
Power generation | |
Units operational | 2 |
Make and model | Alstom |
Nameplate capacity | 732 MW |
Coryton Power Station is a 732 MW gas-fired power station named after the nearby Petroplus Coryton Refinery in Thurrock.
History
The site which is in Coryton Essex United Kingdom is run by Coryton Energy Ltd. It opened in 2002 and was built by Bechtel, is owned by Intergen, based in Burlington, Essex. MA USA, and cost £470 million.
Specification
It is a CCGT type power station that uses natural gas. It has two ABB Alstom GT26 gas turbines from which the exhaust gas leads to two heat recovery steam generators. These power one steam turbine. The station connects to the National Grid at the nearby 400 kV Coryton South substation.
The boiler design is a villager type. Optimised running in marginal markets is not possible due to these weaknesses.