Huangdeng Dam

Huangdeng Dam

Construction site in 2011
Location of Huangdeng Dam in China
Country China
Location Lanping Bai and Pumi Autonomous County, Nujiang Lisu Autonomous Prefecture, Yunnan
Coordinates 26°33′21.65″N 99°6′40.55″E / 26.5560139°N 99.1112639°E / 26.5560139; 99.1112639Coordinates: 26°33′21.65″N 99°6′40.55″E / 26.5560139°N 99.1112639°E / 26.5560139; 99.1112639
Purpose Power
Status Under construction
Construction began 2010
Opening date 2016 (est.)
Dam and spillways
Type of dam Gravity, roller-compacted concrete
Impounds Lancang (Mekong) River
Height 203 m (666 ft)
Length 457 m (1,499 ft)
Reservoir
Total capacity 1,613,000,000 m3 (1,308,000 acre·ft)
Power station
Commission date 2015 (est.)
Type Conventional
Turbines 4 x 475 MW Francis-type
Installed capacity 1,900 MW

The Huangdeng Dam is a gravity dam currently under construction on the Lancang (Mekong) River in Lanping Bai and Pumi Autonomous County of Yunnan Province, China. Construction on the dam began in 2010 and its 1,900 MW hydroelectric power station is expected to be operational in 2016 with the entire project complete in 2017.[1][2]

See also

References

This article is issued from Wikipedia - version of the 1/8/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.