Kilombero Bridge

Kilombero Bridge
Daraja la Kilombero  (Swahili)

MV Kilombero Ferry
Coordinates 8°11′22.46″S 36°41′36.68″E / 8.1895722°S 36.6935222°E / -8.1895722; 36.6935222Coordinates: 8°11′22.46″S 36°41′36.68″E / 8.1895722°S 36.6935222°E / -8.1895722; 36.6935222
Carries 2 lanes
Crosses Ulanga River
Locale 5 km south of Ifakara, Tanzania
Owner Government of Tanzania
Characteristics
Total length 384 metres (1,260 ft)
Width 11.3 metres (37 ft)
History
Engineering design by NIMETA Consult (T) Ltd &
Howard Humphreys (Tanzania) Ltd
Constructed by China Railway 15th Bureau Group Corporation
Construction begin November 2012
Construction end October 2014 (projected)
Construction cost TZS 53.7 billion

Kilombero Bridge is a bridge currently under construction in Tanzania.[1] It will link the towns of Ifakara and Mahenge. Construction work began in November 2012 and is expected to complete in 24 months.[2]

References

  1. "TENDER NO. AE/001/2010-11/HQ/C/28" (PDF). TANROADS. April 2012. Retrieved 7 March 2013.
  2. "Govt to spend 54bn/- to build Kilombero Bridge". IPP Media. 25 October 2012. Retrieved 7 March 2013.


This article is issued from Wikipedia - version of the 4/23/2014. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.