Oil megaprojects (2004)

This page summarizes projects that brought more than 20,000 barrels per day (3,200 m3/d) of new liquid fuel capacity to market with the first production of fuel beginning in 2004. This is part of the Wikipedia summary of Oil Megaprojects—see that page for further details. 2004 saw 24 projects come on stream with an aggregate capacity of 3.357 million barrels per day (533,700 m3/d) when full production was reached (which may not have been in 2004).

Quick Links to Other Years

Overview 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Detailed Project Table for 2004

Country Project Name Year startup Operator Area Type Grade 2P resvs GOR Peak Year Peak Discovery Capital Inv. Notes
OPEC
Algeria Rhourde Oulad Djemma 10/2004 ENI 0.3 2005 80 [1][2][3]
Indonesia Banyu Urip 2004 ExxonMobil 2.0 165
Indonesia Belanak 2004 ConocoPhillips 2.0 35
Iran Doroud 2004 Total 2006 85 [4][5]
Kuwait Sabriya (GC23 Capacity Upgrade) 2005 KOC 4.3 65 [6][7][8]
Libya Elephant NC-174 2/2004 Eni 0.760 2008 150 [9]
Qatar Al Khaleej Ph 1 9/2004 ExxonMobil NGL 40 [10][11]
Qatar RasGas 3 2/2004 NGL 30 [12]
Saudi Arabia Qatif Field/Abu-Safah 12/2004 Saudi Aramco 690

[13]

Venezuela Hamaca Upgrader 8/2004 Chevron 2.0 2005 180 $3.8b [14][15]
Non-OPEC
Angola Block 15 Kizomba A (Chocalho; Hungo) 8/2004 ExxonMobil ODW Crude 1.0 250 [12][16]
Australia Bayu-Undan 2004 ConocoPhillips 9/2004 200 1995 [15]
Brazil Barracuda (P-43) 12/2004 Petrobras 0.770 2005 150 [17][18][19]
Brazil Marlim Sul (FPSO-MLS) 6/2004 Petrobras 2.679 100 [18]
Chad Bolobo 2004 2005 60 [12]
China Caofedian 7/2004 Kerr McGee 0.7 2005 100 [20][21]
Syria Oudeh 2004 Tanganyika 30 [22]
United States Front Runner 10/2004 Murphy Oil ODW Crude 0.15 - 0.2 2005 60 2001 [23]

[24]

United States Llano 4/2004 Shell ODW 0.04 5/2004 32 12/1998 0.215 [25]
United States Glider 7/2004 Shell ODW 20 [26]
United States Magnolia 2004 ConocoPhillips 0.150 2005 50 1999 [27][28]
United States Marco Polo (inc K2, Genghis Khan) 7/2004 Anadarko 120 [29][30]
UK GoldenEye 10/2004 Shell OFF Cond 0.135 2005 30 [12][31]
Yemen East Al Hajr (blk 51) 2004 Nexen Crude 25

See also the 2004 world oil market chronology

This table is available in csv format here (updated daily).

References

  1. "BHP Commits to Major Oil Development in Algeria, BHP Press Release, 6/22/2000".
  2. "BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 31 DECEMBER 2004" (PDF).
  3. "BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 JUNE 2006" (PDF).
  4. "OPEC Upstream Investments Plans, Accessed 12/10/07".
  5. "Offshore Company Plans to Develop Offshore Oil Fields, PetroEnergy Information Network, 3/28/06, Accessed 12/10/07".
  6. "Petrofac to Replace North Kuwait Oil Export System, Press Release, 4/30/05".
  7. "Kuwait Oil Company, 29th Annual Report, 2003-2004".
  8. "Gathering Centres in KOC Oil Fields, Kuwait Oil Company, viewed December 17, 2007".
  9. "Libya Reserves, Geology, NOC, Companies, EIA Country Analysis Brief, Accessed 12/11/07".
  10. "Exxon Financial and Operating Review, 2005" (PDF).
  11. "Total 2004 Annual Report" (PDF).
  12. 1 2 3 4 "ExxonMobil Financial and Operating Review, 2004" (PDF).
  13. "A Nose Dive Towards the Desert".
  14. "ChevronTexaco Announces Completion of Hamaca Crude Upgrading Facility; Production to Ramp Up in Fourth Quarter, Press Release, 8/25/04".
  15. 1 2 "ConocoPhillips Annual Report, 2004".
  16. "Kizomba A and B: Projects Overview, Offshore Technology Conference, May 2006" (PDF).
  17. "Barracuda Achieves First Oil Production, Rigzone, 12/22/2004".
  18. 1 2 "Petrobras Annual Report, 2004" (PDF).
  19. "Deep developments taking shape, Offshore Engineer, 9/1/2004".
  20. "Bohai Oilfield raises output, Alexander's Oil and Gas Connections, 9/17/04".
  21. "Kerr McGee Annual Report, 2005" (PDF).
  22. "Tanganyika achieves first oil production from Syrian field".
  23. "2003 Annual report" (PDF).
  24. "Project: Front Runner".
  25. "Field Description:Llano, Rigzone, Accessed Dec 7th, 2007".
  26. "Glider Takes Flight, Oil Online, Accessed Dec 7th, 2007".
  27. "Magnolia on its marks".
  28. "ConocoPhillips Annual Report, 2004".
  29. "Field Profile: Marco Polo, Rigzone, accessed 12/9/07".
  30. "BHP BILLITON QUARTERLY REPORT ON EXPLORATION AND DEVELOPMENT ACTIVITIES QUARTER ENDED 30 SEPTEMBER 2007, BHPBilliton" (PDF).
  31. "Production starts at Shell operated Howe field in the North Sea".
This article is issued from Wikipedia - version of the 8/12/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.