Sotobō Line

Sotobō Line

E257-500 series EMU on a Sotobō Line Wakashio limited express service, November 2006
Overview
Type Heavy rail
Locale Chiba Prefecture
Termini Chiba
Awa-Kamogawa
Stations 27
Operation
Opened 1896
Operator(s) JR East
Depot(s) Chiba
Technical
Line length 93.3 km (58.0 mi)
Track gauge 1,067 mm (3 ft 6 in)
Operating speed 110 km/h (70 mph)
Route map

The Sotobō Line (外房線 Sotobō-sen) is a railway line in Japan operated by the East Japan Railway Company (JR East) adjacent to the Pacific Ocean, on the eastern (i.e., outer) side of the Bōsō Peninsula. It connects Chiba Station in Chiba to Awa-Kamogawa Station in Kamogawa, passing through Ōami-Shirasato, Mobara, Chōsei, Ichinomiya, Isumi, Onjuku, and Katsuura. The line is connected to the Uchibō Line at both ends. South of Kazusa-Ichinomiya is single track, and north of Kazusa-Ichinomiya is double track.

Services

In addition to local services, limited express and Rapid ("Commuter Rapid") services run on this line.

Tokyo - (Keiyō Line) - Soga - Awa-Kamogawa
(some operate as all-stations "Local" services between Katsuura and Awa-Kamogawa

Station list

Station Japanese Distance (km) Rapid/
Commuter Rapid
Limited express
Wakashio
Transfers Location
(in Chiba)
Chiba 千葉 0.0 O
(to/from Tokyo on Sōbu Line (Rapid) and Yokosuka Line)
to/from Tokyo on Keiyō Line Sōbu Main Line
Chiba Urban Monorail Line 1, Line 2
Keisei Chiba Line (at Keisei Chiba)
Chūō-ku, Chiba
Hon-Chiba 本千葉 1.4  
Soga 蘇我 3.8 O O Uchibō Line, Keiyō Line (through-running)
Kamatori 鎌取 8.8 O   Midori-ku, Chiba
Honda 誉田 12.6 O  
Toke 土気 18.1 O (O)  
Ōami 大網 22.9 O O Togane Line Ōamishirasato
Nagata 永田 25.3  
Honnō 本納 27.7   Mobara
Shin-Mobara 新茂原 31.4  
Mobara 茂原 34.3 O O  
Yatsumi 八積 38.9   Chōsei
Kazusa-Ichinomiya 上総一ノ宮 43.0 O O   Ichinomiya
Torami 東浪見 46.2 O  
Taitō 太東 49.3 O   Isumi
Chōjamachi 長者町 52.1 O  
Mikado 三門 53.7 O  
Ōhara 大原 57.2 O O Isumi Line
Namihana 浪花 60.5 O  
Onjuku 御宿 65.4 O (O)   Onjuku
Katsuura 勝浦 70.9 O O   Katsuura
Ubara 鵜原 74.5    
Kazusa-Okitsu 上総興津 77.2 (O)  
Namegawa-Island 行川アイランド 80.5  
Awa-Kominato 安房小湊 84.3 O   Kamogawa
Awa-Amatsu 安房天津 87.7  
Awa-Kamogawa 安房鴨川 93.3 O Uchibō Line

Rolling stock

Former rolling stock

History

Mobara handcar line
A former handcar converted with a petrol engine at Ohara

The Boso Railway opened the Chiba to Oami section in 1896, extending the line to Kazusa-Ichinomiya the following year and to Ohara in 1899. The company was nationalised in 1907. The extension to Katsuura opened in 1913, to Kazusa-Okitsu in 1927, and Awa-Kamogawa in 1929.

A new tunnel and associated deviation was opened at Toke in 1954 to improve the loading gauge of the line. The Chiba to Soga section was double-tracked between 1960 and 1963, extended to Nagata between 1972 and 1974, with CTC signalling being commissioned between Soga and Awa-Kamogawa in 1974. The line to Kazusa-Ichinomiya was double-tracked between 1980 and 1986, with the Onjuku to Katsuura section double-tracked in 1995, and the Torami to Chojamachi section the following year. The entire line was electrified in 1968, and freight services ceased between 1982 and 1987.

Former connecting lines

References

This article incorporates material from the corresponding article in the Japanese Wikipedia.

  1. "10/21, 房総211系, 営業運転開始" [Boso 211 series enter service]. Japan Railfan Magazine (in Japanese). Vol. 47 no. 549. Japan: Koyusha Co., Ltd. January 2007. p. 179.
Wikimedia Commons has media related to Sotobō Line.
This article is issued from Wikipedia - version of the 9/2/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.