Andal–Sainthia branch line

Andal–Sainthia branch line

Andal railway station and Sainthia railway station
Overview
Type Diesel-electric
System Broad gauge
Status Operational
Locale West Bengal
Termini Andal
Sainthia Junction
Stations 15
Operation
Opened 1913
Owner Indian Railway
Operator(s) Eastern Railway
Technical
Line length 73 km (45 mi)
Track gauge 1,676 mm (5 ft 6 in) Broad Gauge
Operating speed up to 100 km/ h

Andal–Sainthia branch line

Legend

colliery of Raniganj Coalfield
km
to Bardhaman-Asansol section
0 Andal

to Bardhaman-Asansol section

National Highway 2
Grand Trunk Road
8 Sonachara

Kunustoria Colliery
12 Tapasi
15 Ikra(halt)

Sripur Colliery
20 Jamuria(halt)
27 Barabani
33 Chinchuri(halt)
41 Sitarampur
to Asansol–Gaya section
Harishpur
Singaran River
National Highway 2
Grand Trunk Road
5 Kajoragram
10 Siduli

Sitalpur Colliery
12 Ukhra
Pandaveswar Airfield
(abandoned)

Khottadih Open Cast Project

South Samla Colliery
20 Pandabeswar
Ajay River
23 Bhimgara Junction
29 Hazaratpur
33 Raswan
37 Barhragram
42 Lachmanpur Road
49 Palashthali
Hinglo River
29 Panchra
35 Dubrajpur
Bakreshwar River
42 Chinpai
Bakreshwar Thermal
Power Station
45 Kachujor
54 Suri
63 Kunuri
66 Mahisadahari(halt)
Kherua

to Sahibganj Loop
73 Sainthia
to Sahibganj Loop

The Andal–Sainthia branch line is a railway line connecting Andal on the Bardhaman–Asansol section of the Howrah–Delhi Main Line and Sainthia Junction on the Sahibganj Loop. This 73 kilometres (45 mi) track is under the jurisdiction of Eastern Railway. This track passes through the north-eastern part of the Raniganj Coalfield in Bardhaman district and the western part of Birbhum district in the Indian state of West Bengal.

This track serves Bakreshwar Thermal Power Station.

History

The Andal–Sainthia branch line was built in 1913.[1]

Branch lines

There are two branch lines in this section. The first is the Andal–Barabani–Sitarampur section.[2] The other is the Bhimgara-Palasthali Branch Line. Service on this line was suspended for safety reasons. The track became unfit because of unauthorized mining under the track.[3]

Electrification

Electrification of Andal–Pandabeshwar section was completed in 2010–11.[4] Electrification of the Pandabeshwar-Sainthia section was sanctioned in the rail budget for 2011–12, which is expected to be completed till 2013.[5]

References

  1. R. P. Saxena. "Indian Railway History Time line". Irse.bravehost.com. Retrieved 4 January 2014.
  2. "List of Stations on Asansol Division". Eastern Railway. Retrieved 2011-11-20.
  3. Time Table, July 2005, Eastern Zone
  4. "Electrification work in progress by CORE: Progress during the year 2010–11". Central Organisation for Railway Electrification. Retrieved 2011-11-28.
  5. "Electrification of new rail sections". Press information Bureau. Retrieved 2011-11-28.
This article is issued from Wikipedia - version of the 8/5/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.