Klaipėda Geothermal Demonstration Plant

Klaipėda Geothermal Demonstration Plant
Location of Klaipėda Geothermal Demonstration Plant in Lithuania
Country Lithuania
Location Klaipėda
Coordinates 55°41′2″N 21°12′4″E / 55.68389°N 21.20111°E / 55.68389; 21.20111Coordinates: 55°41′2″N 21°12′4″E / 55.68389°N 21.20111°E / 55.68389; 21.20111
Status Operational
Geothermal power station
Min. source temp. 38 °C (100 °F)
Wells 1
Max. well depth 1,100 m (3,600 ft)
Power generation
Thermal capacity 35 MWt

The Klaipėda Geothermal Demonstration Plant is a geothermal heating plant in Klaipėda, Lithuania, constructed during the late 1990s and early 2000s. It was the first geothermal heating plant in the Baltic Sea region.[1] Its purpose was to reduce carbon dioxide, sulfur dioxide, nitrogen oxide, and particulate emissions in the area, as well as to reduce Lithuania's dependence on foreign energy sources. The plant supplies district heating to the city. Construction was financed by a loan from the World Bank (US$5.9 million) and a grant from the Global Environment Facility (US$6.9 million). The Danish state company Dansk Olie og Naturgas (now DONG Energy) provided technical support, and Enterprise Geoterma (EG) served as the implementing agency. The total cost of the plant was US$19.5 million.[2]

Background

After declaring independence from the Soviet Union, the Baltic States of Lithuania and Latvia were left with an energy sector that was heavily reliant on imported gas, oil, and nuclear fuel sources.[3][4] In 1996, when the plant project was appraised, domestic energy sources supplied only 2% of Lithuania's heat demand.[1] The states began considering renewable energy projects in response. Between 1992 and 1994 the Government of Denmark financed a study of the geothermal potential in Lithuania and Latvia called Baltic Geothermal Energy Project. Regional aquifers within the Devonian and Cambrian strata were analyzed along with the energy needs and geothermal potential of 12 urban areas: Klaipėda, Palanga, Šiauliai, Šilalė, Šilutė, Gargzdai, Radviliškis, and Joniškis in Lithuania, and Liepāja, Riga, Jūrmala, and Jelgava in Latvia. On the basis of this project's findings and other investigations, Klaipėda was chosen as a pilot location.[5] The World Bank had estimated the plant would reduce annual emissions of carbon dioxide (CO2) by 47,800 tons and nitrogen dixodes (NOX) by 1 ton if it replaced natural gas as a fuel, and reduce CO2 emissions by 51,940 tons, NOX by 11 tons, and sulfur dioxides by 1,160 tons per year if it additionally replaced heavy fuel oil. According to this estimate, the plant would satisfy about 10% of the city's heat demand.[1]

Plant design and operation

The potential for geothermal heating using the source aquifer arises from the Gotland tectonic belt and PolotskKurzeme fault belt interface in the area, which generates thermal anomalies.[6]

The plant uses 38 °C (100 °F) water from a well drilled into a Devonian aquifer about 1,100 metres (3,600 ft) beneath the surface. The heat is extracted using an absorption heat pump, and circulates in a closed loop. It then contributes to the existing district heating system.[7]

During its construction, difficulties arose when gypsum clogged the well's filters, but these problems were overcome, and in 2004 the State Commission confirmed a plant capacity of 35 MWt, of which geothermal constituted 13.6 MWt. 103,000 MWh of heat were produced in 2001, increasing to 215,000 MWh in 2003.[5]

Enterprise Geoterma experienced financial difficulties, coming close to bankruptcy in 2007. The company planned to reconstruct the plant during 2008, possibly adding electrical generating capacity.[8]

References

  1. 1 2 3 "Implementation Completion Report". The World Bank. 2005. p. 4. Retrieved 2008-05-04.
  2. "Newsletter of the International Geothermal Association" (PDF). International Geothermal Association. 2005. Retrieved 2008-05-04.
  3. Sheeter, Laura (2006-12-08). "Baltic states in EU energy tie-up". BBC News. Retrieved 2008-05-04.
  4. "Promotion of renewable energy in Baltic States (abstract)". Science Direct. 2005. Retrieved 2008-05-04.
  5. 1 2 "Inauguration of first geothermal plant in Lithuania". International Geothermal Association. 2005. Archived from the original on 2008-08-06. Retrieved 2008-05-04.
  6. "Klaipėda tectonic sigmoid" (PDF). Lietuvos mokslų akademija. 2007. Retrieved 2008-05-04.
  7. "Klaipėda Geothermal Demonstration Project" (PDF). Global Environment Facility. 2004. Retrieved 2008-05-04.
  8. "Alternatyvios energijos ateitis - šakėmis ant vandens" (in Lithuanian). delfi.lt. 2008-05-04. Retrieved 2008-05-04.
This article is issued from Wikipedia - version of the 9/11/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.