Line 3, Wuhan Metro
Line 3, Wuhan Metro | |
---|---|
A train at Hongtu Boulevard station in December 2015 | |
Overview | |
Type | Rapid transit |
System | Wuhan Metro |
Status | Operating |
Locale | Wuhan, China |
Termini |
Hongtu Boulevard Zhuanyang Boulevard |
Stations | 24 |
Services | 1 |
Operation | |
Opened | December 28, 2015 |
Owner | Government of Wuhan |
Operator(s) | Wuhan Metro Group Co., Ltd. |
Character | Underground |
Rolling stock | Chinese Type B |
Technical | |
Line length | 33.2 km (20.63 mi)[1] |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
The Line 3 of Wuhan Metro (Chinese: 武汉地铁三号线) is the first underground metro line crossing the Han River. This line crosses five districts of Wuhan: Jiang'an District, Jianghan District, Qiaokou District, Hanyang District and Hannan District (Wuhan Economic-Technological Zone, WEDZ). It started operation on December 28, 2015.[2][3]
History
On February 23, 2012, National Development and Reform Commission approved all construction of Line 3[4] and construction started on March 31.[5][6] All tunnels of Line 3 were finished on October 8, 2015,[7] and all tracks were finished on October 28, 2015.[8] It started operation on December 28, 2015.[2]
Stations
Station name | Transfer | Location | |||
---|---|---|---|---|---|
English | Hanzi | ||||
Hongtu Boulevard | 宏图大道 | Jiang'an | |||
Citizens Home | 市民之家 | ||||
Houhu Boulevard | 后湖大道 | ||||
Xingye Road | 兴业路 | ||||
Erqi Branch Road | 二七小路 | ||||
Luojiazhuang | 罗家庄 | ||||
Zhaojiatiao | 赵家条 | ||||
Huiji 2nd Road | 惠济二路 | ||||
Xianggang Road | 香港路 | ||||
Lingjiaohu | 菱角湖 | Jianghan | |||
Fanhu | 范湖 | 2 | |||
Yunfei Road | 云飞路 | ||||
Wuhan Business District | 武汉商务区 | ||||
Shuangdun | 双墩 | Qiaokou | |||
Zongguan | 宗关 | 1 | |||
Wangjiawan | 王家湾 | 4 | Hanyang | ||
Longyangcun | 龙阳村 | ||||
Taojialing | 陶家岭 | ||||
Sixin Boulevard | 四新大道 | ||||
Hanyang Long-Distance Bus Station | 汉阳客运站 | ||||
Sanjiaohu | 三角湖 | ||||
Sports Center | 体育中心 | ||||
Dongfeng Motor Corporation | 东风公司 | ||||
Zhuanyang Boulevard | 沌阳大道 | ||||
Rolling stock
The first train of Line 3 arrived on March 25, 2015.[9]
References
- ↑ "挖了五年武汉地铁2号线26日贯通 年底通车" (in Chinese). Retrieved 2012-02-24.
- 1 2 "武汉即将地铁成环 "环金时代"重构商业地理" (in Chinese). 长江日报. 2015-12-24. Retrieved 2015-12-24.
- ↑ "One more line! Map of new Wuhan Metro Line 3". Wuhan Time. Nov 27, 2015. Retrieved Dec 24, 2015.
- ↑ "武汉地铁3号线获国家发改委批复 一期下月全面开工" (in Chinese). Retrieved 2012-02-22.
- ↑ "武汉地铁3号线今天正式动建 首穿汉江江底" (in Chinese). Retrieved March 30, 2012.
- ↑ "武汉地铁3号线拟于31日全线开工 线路图抢先看" (in Chinese). Retrieved March 28, 2012.
- ↑ "武汉市副市长王立到武汉三号线七标调研" (in Chinese).
- ↑ "由公司承建的武汉地铁三号线一期工程全线轨道工程顺利贯通,标志着该工程主体施工全面完成" (in Chinese).
- ↑ "1st train of Wuhan Metro Line 3 arrives in Wuhan". Hubei Provincial People’s Government. March 26, 2015. Retrieved Dec 24, 2015.
Wikimedia Commons has media related to Wuhan Metro Line 3. |
This article is issued from Wikipedia - version of the 9/22/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.