Line 5, Chengdu Metro
Line 5, Chengdu Metro | |
---|---|
Overview | |
Type | Rapid transit |
System | Chengdu Metro |
Status | under consturation |
Locale | Chengdu, China |
Termini |
Huazang Huilong Road |
Stations | 41 |
Services | 2 |
Operation | |
Opened | Late 2019 |
Owner | City of Chengdu |
Operator(s) | Chengdu Metro Corporation |
Character | Underground and Elevated |
Depot(s) | Dafeng |
Rolling stock | Yuanhua, Huilong |
Technical | |
Line length | 49.018 km (30.46 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Third rail, 1,500 V DC |
Line 5 of the Chengdu Metro (Chinese: 成都地铁5号线; pinyin: Chéngdū Dìtiě Wǔ Hào Xiàn) runs from Xindu District to Tianfu New District. It starts at Huazang and ends at Huilong Road. The total length is 49.018 km. Line 5's color is purple. This line began construction on 14 September 2015, is scheduled to be complete on late 2019,[1] from Huazang to Huilong Road. Anticipating high demand as the line will provide relief for the older Line 1 and connect several important business and residential districts, the line will use high capacity 8 car A size trains capable of providing capacities of 64,300 people per hour.[2]
Stations
Huazang - Qilong
Huazang - Huilong Road
Phase 1
- Huazang
- Poshuichang (Planned transfer Line 21)
- Liaojiawan
- Northen Trade city
- Xinfuqiao
- Jiudaoyan
- Dujianian
- Dafeng (Planned transfer )
- Shixi Park
- Huanghuayuan
- Gubai
- Quanshui Road (Planned transfer Line 9)
- Dongzikou
- Fuing Road
- Wukiaushi
- Yujvan
- Beizhan West No.2 Road (Consturationed transfer )
- Xibeiqiao (Consturationed transfer )
- Fuqing
- CUTCM & Sichuan People's Hospital (Transfer or )
- Qinyanggong (Planned transfer Line 16)
- Provincial orthopaedic hospital (Planned transfer Line 17)
- Gaoshengqiao (Transfer )
- Keyuan
- Jiuxing Avenue (Planned transfer Line 8)
- Shenxianshu (Consturationed transfer )
- Shiyang Flyover
- Chengdu city No.1 hospital
- Jiaozi Avenue
- Jincheng Avenue (Planned transfer Line 9)
- Jincheng Lake
- Dayuan
- Minle (Planned transfer Line 12)
- Qilong (Planned transfer )
Phase 2
- Chengdu Police academy
- Erjiang Temple
- Nanhu Flyover
- Gaofeng
- Longma Road
- Huilong Road (Planned transfer Line 11)
- South Extsion No Name given
See also
References
- ↑ "成都地铁5号线设41个站 2019年开通运营" [Chengdu Metro Line 5 str 41 stations To be opens in 2019] (in Chinese). Sichuan News. 21 May 2015. Retrieved 2015-07-04.
- ↑ "成都地铁5号线将进行扩容 运能提高约70% ——凤凰房产成都". cd.house.ifeng.com. Retrieved 2016-11-20.
This article is issued from Wikipedia - version of the 11/20/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.