Casey Jr. Circus Train
Casey Jr. Circus Train | |
---|---|
Casey Jr. Circus Train No. 9 at Disneyland, California | |
Disneyland | |
Area | Fantasyland |
Coordinates | 33°48′49″N 117°55′09″W / 33.8137°N 117.9193°W |
Status | Operating |
Opening date | July 31, 1955 |
Disneyland Park (Paris) | |
Name | Casey Jr. Le Petit Train du Cirque |
Area | Fantasyland |
Coordinates | 48°52′31″N 2°46′30″E / 48.8754°N 2.7751°E |
Status | Operating |
Opening date | March 20, 1994 |
General statistics | |
Designer | WED Enterprises / Walt Disney Imagineering |
Theme | Dumbo |
Vehicle type | Train |
Duration | 3:40 (Disneyland) |
Hosted by | Ring Master |
Manufacturer |
Arrow Development (Disneyland) Vekoma (Disneyland Paris) |
Must transfer from wheelchair |
The Casey Jr. Circus Train is a powered roller coaster found at Disneyland and Disneyland Paris. Based on the train of the same name from the 1941 film Dumbo, it gives passengers a tour of many miniature versions of classic Disney animated film scenes. This tour is similar to the one given on the slower paced Storybook Land Canal Boats, but does not incorporate narration.[1] The attraction was opened two weeks later than Disneyland due to testing.
Casey Jr. Circus Train at Disneyland Paris is designed as a roller coaster for small children through Storybook Land, giving riders good views of the Storybook Land castle and other scenes that are not as visible from the Storybook Land Canal Boats.
The Skyway would pass over part of the Casey Junior Circus Train track.
The original 2 ft (610 mm) narrow gauge[2] internal combustion-powered railroad version at Disneyland was manufactured by Arrow Development.[3][4] The powered roller coaster version of the ride in Disneyland Paris was manufactured by Vekoma.[5]
Opening
Once at Disneyland opening time, or its own opening time, the train will back out of the shops. Then a cast member will switch a green switching track aligned for the shops. After that, the train goes on the full route to the station.
Operation
Trains
Casey Jr. has two train sets: No. 7 and No. 9. They consist of (from front to back) a locomotive resembling Casey, a calliope car, a pink open-top chair car seating 4, a monkey and wild animal cage, another open-top chair car painted blue, and a caboose. The locomotive however is not the real engine; the calliope car has an internal combustion engine, as hinted if you hear a loud engine noise when the train is departing. The hill has a chain hill to help get up as well as good measure referencing Casey saying "I think I can". Typically a single train is used with the other train coming out if busier.
Route
Casey departs the station and curves parallel to the Storybook Land docks. Then it passes the hidden backstage area and climbs up the hill with Casey chanting "I think I can". After it completes the hill, it will curve again this time parallel to the station but separated by the Storybook Land water. Then the train will continue and pass above the water and spiral down, where a block signal will stop it to verify its presence. Once it turns green, the train goes into the station with the ringmaster saying it's the end of the lion (really meaning the end of the line). The trains will go slightly slower if both are out. No two trains will ever be out on the line at the same time because one train must be boarding and the other out, despite having 3 block signals.
Closing
Casey Jr. Circus Train (Disneyland) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
After the final trip around Storybookland at Disneyland closing time, the train will continue to the switch near the Storybookland loading dock. Then it will stop. One of the cast members will then switch the green switching track to the backstage spur. Once aligned, the train continues slowly into the shops. If another train should be out, the switch is switched so the train can continue running. Otherwise, the switch is aligned for the shops.
See also
References
- ↑ "MousePlanet Park Guide - Disneyland Resort - Casey Jr. Circus Train". Retrieved May 16, 2010.
- ↑ MiceChat - The Unknown Engineer of the Disneyland Railroad
- ↑ Gurr, Bob (November 27, 2013). "DESIGN: Those Were The Times – No.23 1955 Arrow Development – Ed Morgan and Karl Bacon". MiceChat. Retrieved November 28, 2013.
- ↑ Discover Live Steam - Arrow Dynamics and the Amusement Park Train Archived March 18, 2016, at the Wayback Machine.
- ↑ RCDB.com - Casey Jr., Le Petit Train du Cirque
External links
Wikimedia Commons has media related to Casey Jr. Circus Train. |