Vashi Bridge

Vashi Bridge
वाशी पुल

Old and new Vashi Bridge
Coordinates 19°02′N 72°58′E / 19.04°N 72.97°E / 19.04; 72.97Coordinates: 19°02′N 72°58′E / 19.04°N 72.97°E / 19.04; 72.97
Carries Sion Panvel Highway
Crosses Thane Creek
Locale Mankhurd, Mumbai
Vashi, Navi Mumbai
Official name Vashi Bridge
Other name(s) Thane Creek Bridge
Mankhurd-Vashi Bridge
2nd Thane Creek Bridge
Characteristics
Total length 1837.5 m
History
Constructed by U.P State Bridge Corporation Ltd.
Construction begin 1987
Construction end 1997
Opened 1997
Replaces First Thane Creek Bridge

The Vashi Bridge, also known as Thane Creek Bridge, is a bridge, built across the Thane Creek that connects the city of Mumbai to the Indian mainland at Navi Mumbai. The bridge links the suburb of Mankhurd in Mumbai with Vashi in Navi Mumbai, the satellite city of Mumbai. It is one of four entry points into Mumbai (other three being the Airoli Bridge, Mulund check naka and Dahisar check naka), and handles traffic directed towards the region to the south and east of Mumbai.

History

The first bridge to connect Mumbai to Navi Mumbai was built in 1973. The bridge is 1837m in length and has a substandard 3 lane carriageway. Within two years of its opening to traffic, corrosion cracks were noted on the bottom side of the prestressed girders of some spans. This led to a series of extensive repairs including external prestressing. It was simultaneously decided to construct a new bridge to replace the faulty one.

Construction on a new bridge began in 1987 and opened to traffic in 1992. The original Vashi Bridge or the 1st Thane Creek Bridge remains closed to traffic.[1]

Construction

A new bridge having a 6 lane divided carriageway and length of 1837.35 m (30 m down stream) was constructed from 1987 to 1997 with several unique features in the construction and design with emphasis on durability and a formal QA/QC programme. Proof Consultants were appointed to oversee each aspect of planning, design and construction. Open foundations were taken into the bedrock with foundation concrete being laid in the dry, with the sea water being pumped out using submersible pumps. The piers in the intertidal zone were protected by epoxy coal tar paint painted on 6 mm thick m.s. plate which was considered as a lost shuttering. The superstructure was a P.S.C. box girder, one for each carriageway, constructed using balanced cantilever cast-in-situ segments. The new bridge (also the Vashi Bridge) has performed without any problems whatsoever. This bridge was constructed by U.P State Bridge Corporation Ltd. for which it was awarded the most outstanding concrete structure award.[2]

The new bridge is also known as the 2nd Thane Creek Bridge.

See also

References

  1. Archived March 16, 2006, at the Wayback Machine.
  2. "Welcome To UP State Bridge Corporation Ltd". Bridgecorporationltd.com. Retrieved 2013-08-24.
This article is issued from Wikipedia - version of the 11/14/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.